What if instead of counting down, I want to count up? I have an application in a Geobrick where I need to time how long a process takes and then write that time to a P-variable so I can display it on an HMI. I think I can mock something up by writing Sys.time (or sys.runtime) to one variable at the start of the process, a different variable at the end, and writing the difference between the two to my P-variable, but that will only get me accurate to within a second.
First, am I thinking correctly that this will work?
Second, is there another, better way that will get me accuracy to the tenth or hundredth of a second?